Know what's actually blocking work.
Log everything that's stopping planned work (a missing drawing, a pending approval, a late delivery, the weather) with a cause, an owner and a target date, so delays are explained instead of just reported.
- Seven causes, from Waiting for Drawing to Power Shutdown
- Raised, target and resolved dates on every constraint
- Filter by status, project or site
Constraints Log
Lakeview Commercial Block
Waiting on revised structural drawing · Block B
Waiting for Drawing · Target 10 Sep · Design consultant
TMT steel delivery delayed
Material Unavailable · Target 8 Sep
Client sign-off on elevation change
Waiting for Approval · Target 12 Sep
Heavy rain · concrete pour postponed
Weather · Resolved 3 Sep
Every blocker has a status.
A constraint stays visible until it's resolved.
What each constraint records.
Logged by cause
Waiting for Drawing, Waiting for Approval, Material Unavailable, Weather, Government Inspection, Power Shutdown or Other.
Dates that matter
The date it was raised, the target resolution date and the date it was resolved.
Responsible party
Record who has to clear it.
By project and site
Tie each constraint to a project and, optionally, a site, and filter the log by status, project or site.
On the project
Each project has its own Constraints tab.
More in Execution
Projects
One workspace per project, with budget, progress, issues and health at a glance.
View detailsSite Operations
Daily site reports with weather, progress and photos. Headcount and equipment use are pulled in.
View detailsWorkforce
Attendance by site, payroll worked out from it, and labour cost posted to projects.
View details